Maiden deepwater installation campaign

Energy Disrupter

Fossil energy – Australia

Allseas’ Fortitude has successfully completed her maiden deepwater installation campaign in Western Australia.

As well as providing excellent pipelay support to Audacia, Fortitude installed a series of heavyweight subsea structures to pin-point accuracy. Among them, manifolds weighing 500 tonnes, which registered 720 tonnes on the crane load cell just before landing on the seabed at 1320 water depth.

The Fortitude is now on her way to her first platform removal job.

Original Source: https://ocean-energyresources.com/2021/07/04/maiden-deepwater-installation-campaign/