Final turbine installed at Borssele III/IV
The last of 77 MHI Vestas V164-9.5 MW turbines has now been installed at the Borssele III/IV project site in
Read moreThe last of 77 MHI Vestas V164-9.5 MW turbines has now been installed at the Borssele III/IV project site in
Read moreThursday, November 26 2020 Keppel O&M secured a contract from a repeat customer worth about S$100m for the fabrication and
Read moreWednesday, September 16 2020 Swire Blue Ocean (SBO) intends to order a new vessel with an option for a second
Read moreHeerema Marine Contractors’ SSCV Sleipnir installed the first 6 legs, 3200 tonnes weighing jacket for the Hollandse Kust Zuid Alpha
Read moreWednesday, August 26 2020 Fred. Olsen Windcarrier has been awarded a conditional contract with Liwei Wind Power for the transport
Read moreHeerema’s Aegir started jacket foundation installation on the TPC Offshore Wind Farm alongside its client Jan De Nul Group. Heerema
Read moreHeerema’s DCV Balder has installed Pemex’s Yaxche-C jacket and topside on behalf of client Cotemar S.A de C.V. This project
Read moreCurrently, the crane ship Bokalift 1 is berthed in offshore port IJmuiden, the Netherlands, where it has been loaded with
Read moreOuYang Offshore has awarded AqualisBraemar the construction supervision contract for two newbuild self-elevating wind turbine installation vessels to be constructed
Read moreDogger Bank Wind Farm has signed a contract with Jan de Nul Group for the transport and installation of GE
Read more