First power from Hywind Tampen
Wind Energy – Hywind Tampen Power production from the first turbine in the floating wind farm Hywind Tampen in the
Read moreWind Energy – Hywind Tampen Power production from the first turbine in the floating wind farm Hywind Tampen in the
Read moreGeneral – Collaboration Equinor has signed a strategic collaboration with Hitachi Energy, to collaborate within electrification, renewable power generation and
Read moreThursday, October 20 2022 Wind Energy – Crew Vessel Today, Equinor confirms it has chartered Seacat Columbia (built in 2022),
Read moreSaturday, September 3 2022 Wind Energy – DCO Submission Yesterday Equinor submitted the Sheringham Shoal Offshore Wind Farm Extension and
Read moreGeneral – Rig Moves Siem Offshore announced that Equinor Energy in Norway has declared a 3 month option for the
Read moreFossil Energy – Brazil Equinor Brazil has awarded Valaris a 540-day drilling contract scheduled to start in 2023. The Valaris
Read moreGeneral – Fire Mongstad A fire has been reported at Mongstad early this morning. The incident was reported today at
Read moreFossil Energy – Norway TechnipFMC has been awarded a significant engineering, procurement, construction, and installation (EPCI) contract by Equinor for
Read moreGeneral – Russia On 27 February 2022, Equinor decided to start the process of exiting the company’s Joint Ventures in
Read moreGeneral – Strategic Collaboration To ensure a close and long-term collaboration, Equinor and Aibel have entered into a strategic collaboration
Read moreFossil Energy – Brazil Petrobras, the operator, and Equinor successfully started production from the first two wells of the increased
Read more