Installation of 2,200mt Leg Encircling Crane
General – Leg Encircling Crane
Huisman recently successfully installed a 2,200mt Leg Encircling Crane on a Wind Installation Vessel at Yantai CIMC Raffles Offshore.
Right now, the commissioning phase of the crane is in full swing, with the grand finale being the final load test.
Original Source: https://ocean-energyresources.com/2023/10/14/installation-of-2200mt-leg-encircling-crane/