TechnipFMC awarded first iEPCI in Brazil for Karoon Patola Field

Energy Disrupter

Fossil energy – Brazil

TechnipFMC today has been awarded its first integrated Engineering, Procurement, Construction and Installation (iEPCI) contract in Brazil by Karoon Energy for the Patola field development.

The contract covers engineering, procurement, construction and installation of subsea trees, flexible pipes and umbilicals. The project will take place at water depths of 300 meters and will tie back to the existing Baúna Floating Production, Storage and Offloading (FPSO) vessel, Cidade de Itajaí.

TechnipFMC was chosen based on its recognized technical excellence and capability to deliver complete and integrated solutions. The company will leverage its assets and significant local content in Brazil, including its subsea equipment and flexible pipe plants and its logistics base.

Original Source: https://ocean-energyresources.com/2021/06/03/technipfmc-awarded-first-iepci-in-brazil-for-karoon-patola-field/