Rollingstone loads rocks in Ostend

Energy Disrupter

Wind Energy – Rock Installation

Yesterday, the first load of rocks for the wind farm off the coast of Le Tréport in France was successfully loaded on DEME’s Rollingstone from the REBO terminal.

This project by DEME reaffirms the port of Oostende’s strategic position as a logistics hub for offshore wind energy projects in the North Sea.

Original Source: https://ocean-energyresources.com/2025/03/04/rollingstone-loads-rocks-in-ostend/