McDermott secures contract for Kasawari CCS project in Malaysia

Energy Disrupter

General – CCS Project Malaysia

McDermott has been awarded an offshore contract from Malaysia Marine and Heavy Engineering for the Kasawari Carbon Capture and Storage (CCS) project, located offshore Sarawak in East Malaysia.

Under the scope of the contract, McDermott will perform transportation and the structural installation of a 138-kilometer (85 miles) pipeline section, a 15,000 metric tonne (MT) CCS platform jacket, and bridge connecting to the existing central processing platform.

The installation activities will be performed by one of McDermott’s heavy-lift and pipelay vessels.

Original Source: https://ocean-energyresources.com/2024/01/16/mcdermott-secures-contract-for-kasawari-ccs-project-in-malaysia/