Royal IHC to provide new cable lay system for Boskalis

Energy Disrupter

Wind Energy – Cable Lay Spread

Royal IHC announces the award of a contract from Boskalis for the delivery of an advanced modular cable lay spread (MCLS).

The state-of-the-art cable lay system will be used for the installation of inter-array power cables and its cable protection system (CPS) in offshore wind farms.

The system has some advanced features which will provide the client with a marked advantage during normal lay operations. Royal IHC will deliver the entire spread including; elevated cable highway, chutes, working habitats, quadrant handling system, active heave compensated winch, A&R winches and deck winches. This will be delivered with an integrated control system linking new and client owner-furnished equipment.

Equipment safety is at the core of all Royal IHC designed equipment and the MCLS will be delivered with a new generation centralised control suit.

Careful consideration has also been brought to the mobilisation of the vessel, adopting a sophisticated modular system which will minimise the effort, timescale, and risk traditionally associated with this stage of a campaign.

Original Source: https://ocean-energyresources.com/2022/08/23/royal-ihc-to-provide-new-cable-lay-system-for-boskalis/