Equinor contracts Stril Mar
Energy Disrupter
General – Equinor
Equinor has awarded Møkster with a new contract for the Stril Mar.

The contract length is six months plus options and will commence in end of April.
The Stril Mar is a large modern PSV of UT-776 design built in 2016. Simon Møkster is yet again proud to supply Equinor with a high spec tonnage and can now look back on more than 40 years of continuous service for Equinor.
Original Source: https://ocean-energyresources.com/2022/04/01/equinor-contracts-stril-mar/