Integration lifts for Johan Sverdrup P2 topside (VIDEO)

Energy Disrupter

Fossil energy – construction

On behalf of Equinor, Heerema’s Sleipnir executed the inshore integration lifts for the Johan Sverdrup P2 topside at Aibel’s yard in Gismarvik.

The massive MSF weighs 13,500 metric tons!

Two years after the first steel was cut, the giant main support frame (MSF) module for the Johan Sverdrup P2 platform left Aibel’s yard in Thailand mid-April, 2021.

Original Source: https://ocean-energyresources.com/2021/05/14/integration-lifts-for-johan-sverdrup-p2-topside-video/